NYA
ResourcesPricingStart free
Template·Updated July 31, 2026·Free CSV

Specification sheet template: enough detail to order without a phone call

A per-item interior design spec sheet template covering model numbers, finish codes, COM, dimensions, freight terms and pricing — everything a purchase order is raised from. Free CSV, no email.

By Idan Mann, founder of NYA

The short answer

A specification sheet records one item completely enough that someone who has never spoken to you could order it. This template covers the eighteen fields a purchase order is raised from — model number, finish codes, COM, dimensions, freight terms and pricing — as a fill-in CSV.

Download the CSVNo email, no account. Opens in Excel, Numbers or Google Sheets.

The test of a specification is whether it survives you being unavailable. Not "the walnut one" — the finish code. Not "the large size" — the model number that produces it. Every ambiguity left in a spec becomes a phone call, and every phone call is a place where the wrong item enters production.

What each column carries

One sheet per item. The fields map one-to-one onto the columns of the FF&E schedule, so a schedule row and a spec sheet are the same record at two levels of detail.

FieldWhat goes in itExample
Spec #Matches the item number on the schedule. One number, used everywhere.LR-04
Room / locationWhere it goes, named as the drawings name it.Living Room
ItemPlain description for anyone reading who is not a specifier.Lounge chair
ManufacturerWho makes it, which is not always who you buy it from.Vitra
CollectionThe line or series. Needed when a model number is only unique within a collection.Grand Repos
Model #With the variant suffix. Copied from the vendor, not retyped.AC-402-L
Finish codeAs the vendor writes it. 'Oak' is not a finish code; 'OAK-NAT-04' is.OAK-NAT-04
Fabric / materialIncluding grade, pattern direction and repeat where they apply.F-220, Grade C
COM detailsYardage required, the fabric being supplied, the mill and its lead time. Production does not start until this lands at the factory.6.5 yd, Kravet 34567-11, railroaded
DimensionsW × D × H as specified, plus seat height or clearances where they matter to the plan.32" W × 34" D × 30" H, SH 16"
Weight / crated sizeWhat decides whether it fits a lift, turns a stair, or needs two people. Ask before install day.68 lb / 38" × 40" × 36" crated
QuantityFor this location. Identical items in two rooms are two specifications, because they ship, arrive and install separately.2
Net costYour price after the trade discount, per unit.2400.00
Markup %The markup applied to this line, recorded here so the client price can be derived rather than remembered.35
Client priceDerived from net cost and markup, never typed — a hand-entered price is a price that disagrees with the invoice.3740.00
Lead time quotedIn weeks, with the date quoted and whether it includes transit. It usually does not.12 wks, quoted 2026-07-31, ex-works
Freight termsWho owns the goods on the truck and who files the claim if they arrive damaged.FOB factory, prepaid & add
Ship to / sidemarkYour receiver's address and the project reference that travels with the cartons.Metro Receiving / Bergman — Living Rm
Installation notesAnything the installer needs and the drawing does not say — wall anchoring, assembly on site, access constraints.Assemble on site; base ships separately
Client approvedThe date the client accepted this specification. Without it, an order is being placed on somebody's memory.2026-07-28

Spec sheet, tearsheet, schedule

  • A [tearsheet](/glossary/tearsheet) is what the client sees: photograph, dimensions, client price. One page, one decision.
  • A specification is what you order from: everything above, most of which the client has no use for.
  • A [schedule](/resources/templates/furniture-schedule) is every specification in a table, so the project can be seen at once.
Check the vendor's acknowledgement against this sheet field by field. It is the vendor telling you what they think you ordered, and it is the last moment a transposed finish code is free to fix.

Common questions

How detailed does a spec sheet need to be?
Detailed enough that a person who has never spoken to you could place the order correctly. That is a testable standard: hand the sheet to someone in your office and ask them to raise the PO without asking you anything.
Do I need a spec sheet if I already have a schedule?
For simple stock items the schedule row is usually enough. For anything custom, COM, millwork or high-value, the spec sheet is where the detail lives that will not fit in a row — and it is what you attach to the purchase order.

Or stop keeping it in a spreadsheet

This template works. What it cannot do is generate the proposal from the schedule, record the client's approval per item, or raise the purchase order from what they approved — which is the part that actually goes wrong. NYA is $49/mo for a solo designer and $129 for a studio of up to five, flat, with no per-seat billing.

Start freeDownload the CSV

More templates

  • TemplateFF&E schedule
  • TemplatePurchase order
  • TemplateOrder tracker

Keep reading

  • DefinitionSpecification sheet
  • DefinitionCOM (customer's own material)
  • DefinitionTearsheet
  • DefinitionPurchase order